The Cutting Edge of Medical Technology Content, Community & Collaboration
Time: July 11, 2018 from 1pm to 2pm
Location: Online
Street: 9106 Seven Locks Road
City/Town: Bethesda
Website or Map: https://www.compliancetrainin…
Phone: 1-844-216-5230
Event Type: online, /, webinar
Organized By: Sam Miller
Latest Activity: Jun 27, 2018
Description :
Inventory is one of the Toyota Production System's Seven Wastes, and it is directly proportional to cycle time; the amount of time necessary for a customer order to go through a manufacturing (or service) process. The Theory of Constraints explains why most cycle time is waste in most processes. First, no process can operate more rapidly than its constraint or capacity-constraining resource (CCR). Second, favorable variation in processing times does not offset unfavorable variation because time lost at the constraint is lost forever. (This also explains traffic jams that appear out of nowhere during rush hour.) This webinar will explain the Theory of Constraints and also provide attendees with production control methods to reduce inventory and cycle time enormously.
Objective :
Attendees will learn Dr. Eliyahu Goldratt's Theory of Constraints, understand how variation in processing and material transfer times make it impossible to operate a balanced factory at full capacity. Attendees will also learn about the drum-buffer-rope (DBR) production control system that confines inventory to a buffer at or leading to the capacity-constraining resource to ensure that it never runs out of work, while eliminating inventory from the rest of the process.
|
Areas Covered in the Session :
|
About Speaker:
William A. Levinson, P.E., FASQ, CFPIM, is the owner of Levinson Productivity Systems PC. He holds professional certifications from the American Society for Quality, APICS, and Society of Manufacturing Engineers.
|
© 2024 Created by CC-Conrad Clyburn-MedForeSight. Powered by
RSVP for Webinar On "Cycle Time, Inventory, and The Theory of Constraints" to add comments!
Join MedTech I.Q.